EPF Cohort 7: My Weekly Updates
Reading time: 2 minutesI’m a permissionless fellow in the Ethereum Protocol Fellowship (cohort 7), and I write a short update every week. This page collects all of them in one place: one line per week, with a link to the full update on HackMD.
The arc in short: I started by exploring ePBS (EIP-7732) in Grandine, pivoted after feedback from the Grandine team, and have spent the fellowship since then on syncing from non-finalized checkpoints: research, a design document, a project proposal and then implementation in PR #851.
| Week | Date | What happened |
|---|---|---|
| Week 0 | 11 Jun 2026 | Joined EPF Cohort 7 as a permissionless fellow and started exploring Grandine projects, beginning with ePBS (EIP-7732). |
| Week 1 | 30 Jun 2026 | Researched ePBS and checked in with the Grandine team, who advised against joining ePBS so late; pivoted to syncing from non-finalized checkpoints. |
| Week 2 | 9 Jul 2026 | Deep dive into checkpoint sync, weak subjectivity and Lighthouse’s implementation, including its proposed non-finalized checkpoint sync. |
| Week 3 | 13 Jul 2026 | Traced Grandine’s checkpoint-sync flow and found the core assumption: the startup checkpoint is treated as both trusted anchor and protocol-finalized. |
| Week 4 | 17 Jul 2026 | Turned the research into a draft design document for non-finalized checkpoint sync in Grandine. |
| Week 5 | 20 Jul 2026 | Condensed the design into a concise project proposal and prepared the cohort presentation. |
| Week 6 | 27 Jul 2026 | Addressed proposal feedback from the Grandine team and started the first implementation spike. |
| Week 7 | 10 Aug 2026 | A lighter week around final-year exams; debugged the startup path locally before opening the first PR. |
| Week 8 | 17 Aug 2026 | First implementation spike: loading a selected non-finalized checkpoint with the least invasive changes possible. |
| Week 9 | 17 Aug 2026 | Got Grandine to start from a trusted non-finalized Hoodi checkpoint. |
| Week 10 | 21 Sep 2026 | A lighter protocol week while finishing final-year school responsibilities. |
| Week 11 | 21 Sep 2026 | Milestone 2: preserving protocol finality after starting from a non-finalized checkpoint. |
| Week 12 | 21 Sep 2026 | Completed the first version of Milestone 2 and pushed it to the open Grandine PR. |
| Week 13 | 21 Sep 2026 | Prepared and repeated the Hoodi integration test for Milestone 2. |
| Week 14 | 21 Sep 2026 | Continued the Hoodi integration test and hit a new testing blocker before Grandine could reach the updated finality logic. |
| Week 15 | 21 Oct 2026 | Worked around unreliable public endpoints by validating the non-finalized path through Checkpointz, and added a regression test for the state-root fix. |
The full archive, including comments, lives on my HackMD.